e8879fe5

11.2.13. Removal of air from a hydraulic contour


Pressure regulator


1 – connection of high pressure of a suspension bracket,

2 – deaerator of a contour of high pressure,

3 – connection of the brake system

Elements of a hydropneumatic back suspension bracket (power unit 4 x 4)

 
1 – LHM liquid tank,
2 – cover,
3, 4 – the filter,
5 – jellied stopper,
6 – index,
7 – tank,
8 – pressure sensor,
9 – connection,
10 – heat-shielding casing,
11 – connector,
12 – level sensor,
13 – stabilizer,
14 – pressure regulator,
15 – deaerator,
16 – connections of high and low pressure,
17 – pipeline of removal of liquid,
18 – the pipeline of removal of liquid from suspension bracket cylinders,
19, 20 – pump knot

The deaerator is on pressure regulator.

PERFORMANCE ORDER
1. To connect capacity for removal of air to the regulator deaerator.
2. To open the deaerator.
3. To connect free plugs of the socket near the button of installation of a suspension bracket in the top situation by means of the switch.
4. To connect the socket of power supply of the pump of high pressure.
5. When oil begins to follow in capacity without vials of air, it is necessary to close the deaerator, it is correct (as for normal work) to connect sockets, to fill amount of LHM liquid to necessary level.