9.3. Installation of a power shaft
To clear vents for a power shaft in a nave and the transmission. To grease with a thin layer of lubricant working edges of a sealing ring, a vent of a power shaft and flanges.
LEFT POWER SHAFT
PERFORMANCE ORDER |
1. To establish a power shaft in differential, having combined vents of a power shaft with flutes of semi-axial gear wheels of differential. To insert a power shaft into the transmission against the stop. |
2. To establish the external end of a power shaft in a nave. |
3. To connect the lower hinged connection with the lever. |
4. To establish a new nut of fastening of hinged connection and to tighten it the required moment. To grease inside and a carving of a nut of fastening of a power shaft with pure engine oil, to screw it on a power shaft and to tighten the required moment. To check that the nave rotates freely then to establish a blocking washer and to record it the R-shaped forelock. |
5. To connect the stabilizer of cross stability to the lower lever and to tighten the required moment. |
6. To install the ABS sensor. |
7. To establish a wheel, then to lower the car on the earth and to finally tighten bolts the required moment. |
8. To check oil level in the transmission and if necessary to add. |
|
RIGHT POWER SHAFT
PERFORMANCE ORDER |
1. To check that the intermediate bearing rotates easily and evenly and there is no side play of an external ring in relation to internal. |
2. To grease with a thin layer of lubricant an external ring of the intermediate bearing and an internal ledge for a dustproof cover. |
|
3. To insert the internal end of a shaft through a suspension bracket of installation of the intermediate bearing and to establish a dustproof cover on a power shaft. |
4. To combine internal vents of a power shaft with grooves of a semi-axial gear wheel of differential, the intermediate bearing with a suspension bracket of installation and to insert a power shaft against the stop into the transmission. |
5. To install the external hinge of equal angular speeds in a nave. |
|
6. To check correctness of installation of the intermediate bearing, then to turn bolts on 90 ° and to enshrine them in this provision by nuts. To close the intermediate bearing a dustproof cover. |
7. To connect the lower hinged connection with the lever. |
8. To establish a new nut of fastening of hinged connection and to tighten it the required moment. To grease inside and a carving of a nut of fastening of a power shaft with pure engine oil, to screw it on a power shaft and to tighten the required moment. To check that the nave rotates freely then to establish a blocking washer and to record it the spring R-shaped forelock. |
9. To connect the stabilizer of cross stability to the lower lever and to tighten the required moment. |
10. To install the ABS sensor. |
11. To establish a wheel, then to lower the car on the earth and to finally tighten bolts the required moment. |
12. To check oil level in the transmission and if necessary to add. |
13. To establish the lower casing (equipment in some versions). |
|