e8879fe5

4.2.4. Injector

Air filter (system of injection of Magneti Marelli fuel)


Screws of fastening of a nozzle on the Monopoint Bosch system

Screws of fastening of a nozzle are noted by shooters.

Removal

PERFORMANCE ORDER
1. To remove a weight wire from the accumulator and the air filter.
2. To remove wires from a potentiometer of provision of a butterfly valve, a nozzle and the engine of management of a priotkryvaniye of a butterfly valve.
3. To remove fuel and returnable hoses (are specified by shooters for poly late model).
4. To remove an accelerator cable.
5. To unscrew screws of fastening of an injector to an inlet collector and to remove it together with laying.

Installation

PERFORMANCE ORDER
Installation is into place made in the sequence of the return to removal, at the same time it is necessary to consider:
      – surfaces of a prileganiye have to be dry and pure. It is obligatory to establish new laying;
      – it is correct to connect all hoses and sockets.