e8879fe5

3.3.31. Assembly of a secondary shaft

PERFORMANCE ORDER
1. To install on a shaft the forward bearing on the press, putting pressure to 2 t.
2. To remove the spring fixing ring of the forward bearing.
3. To insert a gear wheel of the 1st transfer and to establish the spring fixing ring.
4. To insert a ring of the synchronizer of the 1st transfer, the sliding plug together with a nave of 1-2 transfers, and also a ring of the synchronizer of the 2nd transfer.
5. To insert a gear wheel of the 2nd transfer and to establish the spring fixing ring.
6. To insert a gear wheel of the 3rd transfer and to establish the spring fixing ring.
7. To insert a ring of the synchronizer of the 3rd transfer, the sliding plug together with a nave of 3-4 transfers, a ring of the synchronizer of the 4th transfer, a gear wheel of the 4th transfer.
8. To establish a washer and the back ball bearing on a shaft.