e8879fe5

3.3.21. Dismantling of a secondary shaft

PERFORMANCE ORDER
1. To remove on the press from a shaft the back ball bearing.
2. To remove from a shaft laying, a gear wheel of the 4th transfer, a ring of the synchronizer of the 4th transfer, the sliding plug together with a nave of 3-4 transfers (without separation of the plug from a nave) and a ring of the synchronizer of the 3rd transfer.
3. To remove the spring fixing ring and a gear wheel of the 3rd transfer.
4. To remove the spring fixing ring and a gear wheel of the 2nd transfer.
5. To remove a ring of the synchronizer of the 2nd transfer, the sliding plug together with a nave of 1-2 transfers (without separation of the plug from a nave) and a ring of the synchronizer of the 1st transfer.
6. To remove the spring fixing ring and a gear wheel of the 1st transfer.
7. To remove the spring fixing ring of the forward bearing.
8. To remove the forward bearing on the press.